Sausalito Slide Repair
Brief Description:
Emergency slide repair that consisted of a new 35 ft  concrete wall, 15 18" concrete piers, rip-rap, planting pockets, and an emergency shot-crete reinforcement during a heavy rain event. 
Location: Sausalito
Year Completed: 2022
Engineer/Architect: Gregory Paul Wallace/ Michael Rex Architects
The Completed Project:
The Construction Process: