San Rafael Slide Repair
Brief Description:
Emergency slide repair that consisted of 1400 sq.ft of removed slide material and a 90 x 8' W8x24 I-beam lagging wall. A temporary catchment wall was also constructed below the slide.
Location: San Rafael
Year Completed: 2021
Engineer/Architect: Tom Tormey
The Completed Project:
The Construction Process: